29 CFR 1926 - Subpart CC 4.20.08



Publisher Description



29 CFR 1926 - OSHA Construction

Subpart CC - Cranes and Derricks in Construction

Data is current as of September 1, 2020

For future updates please install our OSHA Construction App:
https://play.google.com/store/apps/details?id=com.regpub.osha.construction

Table of Contents:

§1926.1400 - Scope.
§1926.1401 - Definitions.
§1926.1402 - Ground conditions.
§1926.1403 - Assembly/Disassembly - selection of manufacturer or employer procedures.
§1926.1404 - Assembly/Disassembly - general requirements (applies to all assembly and disassembly operations).
§1926.1405 - Disassembly - additional requirements for dismantling of booms and jibs (applies to both the use of manufacturer procedures and employer procedures).
§1926.1406 - Assembly/Disassembly - employer procedures - general requirements.
§1926.1407 - Power line safety (up to 350 kV) - assembly and disassembly.
§1926.1408 - Power line safety (up to 350 kV) - equipment operations.
§1926.1409 - Power line safety (over 350 kV).
§1926.1410 - Power line safety (all voltages) - equipment operations closer than the Table A zone.
§1926.1411 - Power line safety - while traveling under or near power lines with no load.
§1926.1412 - Inspections.
§1926.1413 - Wire rope - inspection.
§1926.1414 - Wire rope - selection and installation criteria.
§1926.1415 - Safety devices.
§1926.1416 - Operational aids.
§1926.1417 - Operation.
§1926.1418 - Authority to stop operation.
§1926.1419 - Signals - general requirements.
§1926.1420 - Signals - radio, telephone or other electronic transmission of signals.
§1926.1421 - Signals - voice signals - additional requirements.
§1926.1422 - Signals - hand signal chart.
§1926.1423 - Fall protection.
§1926.1424 - Work area control.
§1926.1425 - Keeping clear of the load.
§1926.1426 - Free fall and controlled load lowering.
§1926.1427 - Operator qualification and certification.
§1926.1428 - Signal person qualifications.
§1926.1429 - Qualifications of maintenance & repair employees.
§1926.1430 - Training.
§1926.1431 - Hoisting personnel.
§1926.1432 - Multiple-crane/derrick lifts - supplemental requirements.
§1926.1433 - Design, construction and testing.
§1926.1434 - Equipment modifications.
§1926.1435 - Tower cranes.
§1926.1436 - Derricks.
§1926.1437 - Floating cranes/derricks and land cranes/derricks on barges.
§1926.1438 - Overhead & gantry cranes.
§1926.1439 - Dedicated pile drivers.
§1926.1440 - Sideboom cranes.
§1926.1441 - Equipment with a rated hoisting/lifting capacity of 2,000 pounds or less.
§1926.1442 - Severability.
Appendix A to Subpart CC of Part 1926 - Standard Hand Signals
Appendix B to Subpart CC of Part 1926 - Assembly/Disassembly: Sample Procedures for Minimizing the Risk of Unintended Dangerous Boom Movement
Appendix C to Subpart CC of Part 1926 - Operator Certification: Written Examination: Technical Knowledge Criteria


About 29 CFR 1926 - Subpart CC

29 CFR 1926 - Subpart CC is a free app for Android published in the Reference Tools list of apps, part of Education.

The company that develops 29 CFR 1926 - Subpart CC is Reg.Pub. The latest version released by its developer is 4.20.08.

To install 29 CFR 1926 - Subpart CC on your Android device, just click the green Continue To App button above to start the installation process. The app is listed on our website since 2020-09-11 and was downloaded 6 times. We have already checked if the download link is safe, however for your own protection we recommend that you scan the downloaded app with your antivirus. Your antivirus may detect the 29 CFR 1926 - Subpart CC as malware as malware if the download link to com.RegPub.OSHA.Construction.SubpartCC is broken.

How to install 29 CFR 1926 - Subpart CC on your Android device:

  • Click on the Continue To App button on our website. This will redirect you to Google Play.
  • Once the 29 CFR 1926 - Subpart CC is shown in the Google Play listing of your Android device, you can start its download and installation. Tap on the Install button located below the search bar and to the right of the app icon.
  • A pop-up window with the permissions required by 29 CFR 1926 - Subpart CC will be shown. Click on Accept to continue the process.
  • 29 CFR 1926 - Subpart CC will be downloaded onto your device, displaying a progress. Once the download completes, the installation will start and you'll get a notification after the installation is finished.



RELATED PROGRAMS
Our Recommendations






BarCode2D-PNG


Click stars to rate this APP!

Users Rating:  
  0.0/5     0
Downloads: 6
Updated At: 2024-03-19
Publisher: Reg.Pub
Operating System: Android
License Type: Free